UCF New Construction Pics

 

Click on the thumbnails to expand pictures

Note:  The images below (once expanded by clicking the thumbnails) are the original full size images although your browser may be set to automatically scale the image size to fit your screen.  For SOME pictures it is better to see them in full resolution.   For others the pictures are just too huge.  Someday I might resize them to a happy medium.
To view them in full resolution either adjust your browser settings or save the image to your computer and view it with an image program. 

To view images in full size using Internet Explorer do the following:

In later versions of Netscape and Internet Explorer you can simply left click alternately on the image to toggle between full size and scaled size.   That way you can just toggle back and forth between the scaled size and the full size with a mouse click. 

 

 

 

October 24, 2004
This is going to be housing and is just west of the Arena.

 

 

October 24, 2004
This is going to be a parking garage and is just west of the Arena.

 

 

November 16, 2004
Surface parking outside of Jay Bergman Field

 

 

November 16, 2004
Surface parking outside of Jay Bergman Field

 

 

November 16, 2004
Housing Tower 1 (west of Arena)

 

 

November 16, 2004
Fairwinds Alumni Center

 

 

November 16, 2004
Housing Tower 1 (west of Arena)

 

 

December 19, 2004
Surface parking outside of Jay Bergman Field

 

 

December 19, 2004
Surface parking outside of Jay Bergman Field

 

 

December 19, 2004
Surface parking outside of Jay Bergman Field

 

 

December 19, 2004
Parking garage (between Housing and Softball Field)

 

 

December 19, 2004
Housing Tower 1 (west of Arena)

 

 

December 19, 2004
Housing Tower 1  (west of Arena)

 

 

December 19, 2004
Housing Tower 1  (west of Arena)

 

 

December 19, 2004
Housing Tower 1  (west of Arena)

 

 

December 19, 2004
Housing Tower 1  (west of Arena)

 

 

December 19, 2004
Fairwinds Alumni Center

 

December 19, 2004
Recreational Pool

 

December 19, 2004
Recreational Pool

 

December 19, 2004
Recreational Pool

 

December 19, 2004
Retention Pond (south of existing pond that is east of new Wayne Densch Sports Center)

 

December 19, 2004
Retention Pond (south of existing pond that is east of new Wayne Densch Sports Center)

 

December 19, 2004
Building on fire behind Security Police building

 

December 19, 2004
Building on fire behind Security Police building

 

January 7, 2005
Recreational Pool

 

January 7, 2005
Recreational Pool

 

January 7, 2005
Recreational Pool

 

January 7, 2005
Housing Tower 1  (west of Arena)

 

January 7, 2005
Parking garage (between Housing and softball field)

 

January 7, 2005
View from Housing Tower 1 on 7th floor

 

January 7, 2005
View from Housing Tower 1 on 7th floor

 

January 7, 2005
Parking garage (view from Housing Tower 1 on 7th floor)

 

January 7, 2005
Housing Tower 1  (west of Arena)

 

January 7, 2005
Housing Tower 1  (west of Arena)

 

January 7, 2005
Fairwinds Alumni Center

 

January 7, 2005
Fairwinds Alumni Center

 

January 18, 2005
Fairwinds Alumni Center

 

January 18, 2005
Fairwinds Alumni Center

 

January 18, 2005
Housing Tower 1 (west of Arena)

 

January 18, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

January 23, 2005
Housing Tower 1 (west of Arena)

 

January 23, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

January 23, 2005|
Fairwinds Alumni Center

 

January 23, 2005|
Parking garage (between Housing Tower 1 and softball field)

 

January 23, 2005|
Imagine...  just beyond the parking lot - our new football stadium!

 

January 31, 2005
Parking garage (between Housing and softball field)
These verticals went up in one day and the rest should go up fast as well.  These will NOT look like the other parking garages on campus.  It will look more like a building with windows more so than a parking garage.  The whole athletic node will have a Winter Park type of look to it when completed.

 

February 3, 2005
Parking garage (between Housing and softball field)

 

February 3, 2005
Housing Tower 1 (west of Arena)

 

February 8, 2005
Parking garage (between Housing Tower 1 and softball field)

 

February 13, 2005
Parking garage (between Housing Tower 1 and softball field)

 

February 13, 2005
Housing Tower 1 (west of Arena)

 

February 13, 2005|
Fairwinds Alumni Center

 

February 13, 2005
Housing Tower 1 and parking garage

 

February 13, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

February 13, 2005
Retention Pond (south of existing pond that is east of new Wayne Densch Sports Center)
This must be completed before occupancy of the Nicholson Field House is permitted.
Also - there was once some talk going around that this new pond could replace the facility at Lake Pickett, but the truth is that for rowing competition there must be a straight section of water of a minimum length (which I do not know).  What is known though is that this pond would have to go as far as Research Park in order to be long enough for rowing competition.

 

February 13, 2005
Retention Pond (south of existing pond that is east of new Wayne Densch Sports Center)

 

February 13, 2005
Retention Pond (south of existing pond that is east of new Wayne Densch Sports Center)

 

February 13, 2005
Recreational Pool (with what appears to be the concrete foundations for the canopy assembly)

 

February 13, 2005
Recreational Pool

 

February 19, 2005
Recreational Pool

 

February 19, 2005
Recreational Pool

 

February 20, 2005
Parking garage and housing Tower 1
(note how the garage will look more like the housing building than a parking garage)

 

February 20, 2005
Parking garage

 

February 20, 2005
Fairwinds Alumni Center

 

March 1, 2005
Parking garage

 

 

March 1, 2005
Parking garage

 

 

March 12, 2005
Parking garage

 

March 12, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

March 12, 2005
Fairwinds Alumni Center

 

March 12, 2005
Housing Tower 1 (west of Arena) - Multi-colored exterior test patterns being applied

 

March 22, 2005
Recreational Pool

 

March 22, 2005
Parking garage

 

March 22, 2005
Parking garage

 

March 22, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

March 22, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

March 22, 2005
Land cleared for 2nd and 3rd housing towers and parking garage

 

March 22, 2005
Housing Tower 1 (west of Arena) - white base coat being applied

 

March 22, 2005
Housing Tower 1 (west of Arena) - white base coat and multi-colored exterior test patterns being applied

 

March 22, 2005
Fairwinds Alumni Center

 

March 22, 2005
Fairwinds Alumni Center

 

March 29, 2005
Land clearing (east of Wayne Densch Sports Center) for new football practice fields

 

March 29, 2005
Land clearing (east of Wayne Densch Sports Center) for new football practice fields

 

March 29, 2005
Land clearing for new softball stadium

 

April 5, 2005
Recreational Pool

 

April 5, 2005
Recreational Pool

 

April 5, 2005
New Student Health Center (http://www.fp.ucf.edu/ActivityReport/new/newData/student_health_center.htm)

 

April 5, 2005
New Student Health Center (Close-up of sign)

 

April 5, 2005
New Student Health Center

 

April 5, 2005
Parking garage

 

April 5, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint being applied

 

April 5, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint being applied

 

April 5, 2005
Fairwinds Alumni Center

 

April 5, 2005
Fairwinds Alumni Center

 

April 5, 2005
Fairwinds Alumni Center

 

April 5, 2005
Land being cleared east of Wayne Densch Sports Center for new football practice fields

 

April 14, 2005
Recreational Pool

 

April 19, 2005
Recreational Pool

 

April 19, 2005
Recreational Pool

 

April 21, 2005
Fairwinds Alumni Center

 

April 21, 2005
Engineering 3 Building (in the center)

 

May 8, 2005
Fairwinds Alumni Center

 

May 8, 2005
Fairwinds Alumni Center

 

May 8, 2005
Parking Garage (west of Arena)

 

May 8, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint being applied

 

May 8, 2005
Housing Tower 1 / Parking Garage (west of Arena) - multi earth tone paint being applied

 

May 8, 2005
New Student Health Center (http://www.fp.ucf.edu/ActivityReport/new/newData/student_health_center.htm)

 

May 8, 2005
(back of) Engineering 3 Building

 

May 15, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint being applied - now taking rental applications

 

May 16, 2005
Recreational Pool (with water!!!)

 

May 16, 2005
Recreational Pool (with water!!!)

 

May 21, 2005
Parking Garage (west of Arena)

 

May 21, 2005
Housing Tower 1 (west of Arena)


May 21, 2005
Housing Tower 1 and parking garage (west of Arena)

 

May 21, 2005
Housing Tower 1 (west of Arena)

 

May 21, 2005
Right side:  Housing Tower 1 (west of Arena)
Background:  Fairwinds Alumni Center

 

May 21, 2005
Fairwinds Alumni Center

 

May 21, 2005
New retention pond (across road from Wayne Densch Sports Center)

 

May 21, 2005
Foreground:  Northern tip of new retention pond (across road from Wayne Densch Sports Center)
Background:  Existing retention pond
Water is being pumped from the existing retention pond into the new retention pond

 

May 21, 2005
Recreational pool (sod and landscaping in progress)

 

May 21, 2005
Recreational pool (sod and landscaping in progress)

 

May 21, 2005
Recreational pool (sod and landscaping in progress)

 

June 13, 2005
Arena retention pond being drained in preparation to build Convocation Center
   wait a minute...  is that guy flipping me off?  :-)

 

June 13, 2005
Fairwinds Alumni Center

 

June 13, 2005
Recreational pool

 

June 20, 2005
New softball stadium (south side of new retention pond)
Covered batting cage is shown in the process of being reassembled after moving it from the previous complex

 

June 22, 2005
Recreational pool

 

June 27, 2005
Arena retention pond being drained in preparation to build Convocation Center

 

June 27, 2005
Parking Garage (west of Arena)

 

June 27, 2005
Housing Tower 1 and parking garage (west of Arena)

 

July 6, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center

 

July 11, 2005
New softball stadium (south side of new retention pond)

 

July 18, 2005
Land being cleared for 2nd of 4 housing towers

 

July 18, 2005
Land being cleared for 2nd of 4 housing towers

 

July 18, 2005
New softball stadium (south side of new retention pond)

 

July 18, 2005
New softball stadium (south side of new retention pond)

 

July 18, 2005
Recreational pool - canopy being installed and raised.
 

 

July 18, 2005
Recreational pool (canopy being installed and raised)

 

July 20, 2005
Recreational pool (canopy being installed and raised)

 

July 25, 2005
Recreational pool

 

July 25, 2005
Land being cleared for 2nd of 4 housing towers

 

July 25, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center

 

July 25, 2005
Fairwinds Alumni Center

 

July 27, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center

 

July 27, 2005
Land being cleared for the 3rd and 4th housing towers as well as parking garage

 

July 27, 2005
Fairwinds Alumni Center

 

July 27, 2005
Recreational pool

 

August 6, 2005
New Softball Stadium

 

August 6, 2005
New Softball Stadium

 

August 6, 2005
Foundation for 2nd of 4 New Housing Towers
(pic taken from new parking garage roof)

 

August 6, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center
(pic taken from new parking garage roof)

 

September 11, 2005
New softball stadium

 

September 11, 2005
New softball stadium

 

September 11, 2005
New softball stadium (batting cage)

 

September 11, 2005
Fairwinds Alumni Center

 

September 11, 2005
Fairwinds Alumni Center

 

September 11, 2005
Housing Tower 2 (background)

 

September 11, 2005
Housing Tower 2

 

September 11, 2005
Materials coming in for parking garage and  Housing Towers 3 & 4

 

September 11, 2005
F1 parking lot being removed

 

September 11, 2005
Construction preps for Convocation Center

 

September 11, 2005
Recreation Pool

 

September 11, 2005
Recreation Pool

 

October 9, 2005
Housing Tower 2

 

October 9, 2005
Housing Tower 2

 

October 9, 2005
Ground preps for Housing Towers 3 and 4 as well as parking garage

 

October 9, 2005
Fairwinds Alumni Center

 

October 9, 2005
Recreational Pool - Now Open

 

October 9, 2005
Recreational Pool - Now Open

 

October 9, 2005
New Student Health Center

 

October 9, 2005
New Student Health Center

 

October 9, 2005
New Softball Stadium - view from home plate

 

October 9, 2005
New Softball Stadium

 

October 9, 2005
New Softball Stadium - view from Center Field

 

October 30, 2005
Housing Tower 2

 

October 30, 2005
Ground preps for Housing Towers 3 and 4 as well as parking garage
Tower 3 (or 4?) can be seen in the background

 

October 30, 2005
Ground preps for Housing Towers 3 and 4 as well as parking garage
Tower 3 (or 4?) construction has begun

 

October 30, 2005
Construction preps for Convocation Center

 

October 30, 2005
Obviously not a new construction pic.  This is my God daughter Beth who wants to go to FSU.  Hopefully this tour will change her mind!

 

November 12, 2005
Housing Tower 2

 

November 12, 2005
Housing Tower 3

 

November 12, 2005
Housing Tower 3

 

November 12, 2005
Construction preps for Convocation Center

 

November 12, 2005
Arena stairs coming down (Arena will be renovated)

 

November 12, 2005
Fairwinds Alumni Center

 

December 11, 2005
Housing Tower 2

 

December 11, 2005
Housing Tower 3

 

December 11, 2005
Housing Tower 3, Ground preps for parking garage and Housing Tower 4

 

December 11, 2005
Convocation Center initial construction

 

December 11, 2005
Convocation Center foundation underway

 

December 11, 2005
Convocation Center foundation underway
(Housing Tower 3 in background)

 

January 8, 2006
Retail "A"  next to Housing Tower 1 and Convocation Center

 

January 8, 2006
Retail "A"  next to Housing Tower 1 and Convocation Center

 

January 8, 2006
Convocation Center construction

 

January 8, 2006
Convocation Center construction

 

January 8, 2006
Convocation Center construction

 

January 8, 2006
Convocation Center construction (Housing Tower 3 in background)

 

January 8, 2006
Housing Tower 3

 

January 8, 2006
Housing Tower 3

 

January 8, 2006
Housing Tower 3

 

January 8, 2006
Housing Tower 3 (as seen from front of Wayne Densch Sports Center)

 

January 8, 2006
Underground utilities being added by Jay Bergman Field

 

January 8, 2006
New Soccer Fields being graded (in the background)

 

January 8, 2006
Housing Tower 2

 

January 8, 2006
Parking garage V  (University Blvd shown in background)

 

February 19, 2006
Housing Tower 2

 

February 19, 2006
Housing Tower 3

 

February 19, 2006
Housing Tower 3

 

February 19, 2006
Housing Tower 3

 

February 19, 2006
Convocation Center (Retail "A" shown in background)

 

February 19, 2006
Convocation Center

 

February 19, 2006
Convocation Center

 

February 19, 2006
Convocation Center

 

February 19, 2006
Convocation Center

 

February 19, 2006
Retail "A"  <<<Click this link

 

February 19, 2006
Psychology Building  <<<Click this link

 

February 19, 2006
Softball Stadium

 

February 19, 2006
Softball Stadium

 

February 19, 2006
Softball Stadium

 

February 19, 2006
Softball Stadium

 

February 19, 2006
Softball Stadium

 

February 19, 2006
Softball Stadium

 

February 19, 2006
Softball Stadium

 

March 19, 2006
Housing Tower 3 (Background) and Housing Tower 4 (foreground)

 

March 19, 2006
Housing Tower 3 and Housing Tower 4 (Twr 4 is to the left)

 

March 19, 2006
Housing Tower 4

 

March 19, 2006
Housing Tower 2

 

March 19, 2006
Convocation Center (Retail "A" shown along street at right)

 

March 19, 2006
Convocation Center

 

March 19, 2006
Convocation Center (Housing Towers 3 and 4 in the background)

 

March 19, 2006
Convocation Center (Housing Towers 3 and 4 in the background)

 

March 19, 2006
Convocation Center (Housing Towers 3 and 4 in the background)

 

March 19, 2006
Convocation Center

 

March 19, 2006
Retail "A"  <<<Click this link

 

March 19, 2006
Psychology Building  <<<Click this link

 

March 19, 2006
Parking garage V  <<<Click this link
(University Blvd shown in background)

 

March 19, 2006
Softball stadium Press Box

 

       Video  Video  Video  Video  Video  Video  Video  Video   

       Video  Video  Video  Video  Video  Video  Video  Video   

Click the photo above and allow time for the video to download and automatically play.  It may be jittery on your first viewing, but should smooth out after that.

The video consists of the Psychology Bldg,, Convo Center, Housing 3 & 4, Football practice fields, CREOL extension, Engineering 3, and Parking Garage V.

 

April 23, 2006
Convocation Center

 

April 23, 2006
Retail "A"  <<<Click this link

 

April 23, 2006
Housing Towers 3 and 4

 

April 23, 2006
Convocation Center

 

    

April 23, 2006
Psychology Building  <<<Click this link

 

    

April 23, 2006
Football practice fields

 

April 23, 2006
Parking Garage & Housing Towers 3 and 4 (as seen from Wayne Densch)

 

April 23, 2006
Parking Garage (as seen from Wayne Densch)

 

April 23, 2006
CREOL Extension

 

April 23, 2006
Engineering 3  <<<Click this link

 

April 23, 2006
Parking garage V  (University Blvd shown in background)

 

May 20, 2006
Land preparations for football stadium
 

 

May 20, 2006
Land preparations for football stadium
 

 

May 20, 2006
New football practice fields
 

 

May 20, 2006
New football practice fields
 

 

May 20, 2006
Land preparations for football stadium
 

 

May 20, 2006
Land preparations for football stadium
 


May 20, 2006
Land preparations for football stadium
 

 

May 20, 2006
Convocation Center
 

 

May 20, 2006
Convocation Center
 

 

May 20, 2006
Convocation Center
 

 

May 20, 2006
Convocation Center
 

 

May 20, 2006
Convocation Center, Housing Towers 3 and 4, Parking Garage
 

 

May 20, 2006
Psychology Building
 

 

May 20, 2006
Convocation Center

 

June 8, 2006
Convocation Center

 

June 8, 2006
Convocation Center

 

June 8, 2006
Convocation Center

 

June 8, 2006
Retail "A"  <<<Click this link

 

June 8, 2006
Housing Tower 4

 

June 8, 2006
Housing Towers 3 and 4

 

June 8, 2006
Ground Preps for Football Stadium

 

June 8, 2006
Ground Preps for Football Stadium

 

June 8, 2006
New Football Practice Fields

 

June 8, 2006
New Football Practice Fields and Ground Preps for Football Stadium

 

June 8, 2006
New Football Practice Fields and Ground Preps for Football Stadium

 

June 8, 2006
New Football Practice Fields

 

June 8, 2006
New Football Practice Fields

 

June 8, 2006
Housing Towers 3 & 4 and Parking Garage

 

 

 

July 2, 2006
Ground Preps for Football Stadium

 

July 2, 2006
Ground Preps for Football Stadium

 

July 2, 2006
Ground Preps for Football Stadium

 

July 2, 2006
Ground Preps for Football Stadium

 

July 2, 2006
Practice Fields and Ground Preps for Football Stadium

 

July 2, 2006
Convocation Center

 

July 2, 2006
Convocation Center

 

July 2, 2006
Convocation Center

 

July 2, 2006
Convocation Center

 

July 2, 2006
Convocation Center

 

July 2, 2006
Convocation Center

 

July 2, 2006
Retail "A"

 

July 2, 2006
Parking Garage and Housing Tower 3

 

July 2, 2006
Housing Towers 3 and 4

 

July 2, 2006
Housing Tower 4

 

July 2, 2006
Housing Tower 3

 

July 2, 2006
Not new construction, but it looked like a Kodak moment anyway

 

 

August 4, 2006
Football Stadium

 

August 4, 2006
Football Stadium

 

August 4, 2006
Football Stadium

 

August 4, 2006
Football Stadium

 

August 4, 2006
Football Stadium

 

August 4, 2006
Football Stadium

 

August 4, 2006
Football Stadium (as seen from tower in practice fields)

 

August 4, 2006
Football Stadium (as seen from tower in practice fields)

 

August 4, 2006
Football Stadium (as seen from tower in practice fields)

 

August 4, 2006
Football Stadium (as seen from tower in practice fields)

 

August 4, 2006
New Practice Fields

 

August 4, 2006
New Practice Fields

 

August 4, 2006
New Practice Fields

 

August 4, 2006
New Practice Fields

 

August 4, 2006
New Practice Fields

 

August 4, 2006
New Practice Fields

 

August 4, 2006
Matt Davis and Paul Bender getting video equipment ready for tomorrow's practice
Matt (left) recently joined UCF having come from Marshall.  Let's try to like him anyway!

 

August 4, 2006
Convocation Center

 

August 4, 2006
Housing Tower 3 (left) and Convocation Center (right)

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center (seating area starting to take shape)

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Convocation Center

 

August 4, 2006
Parking Garage (left) and Housing Tower 3 (right)

 

August 4, 2006
Housing Tower 3 (left) and Convocation Center (right)

 

August 4, 2006
Housing Tower 2

 

August 4, 2006
Housing Tower 4

 

August 4, 2006
Housing Tower 3

 

August 4, 2006
Housing Tower 4

 

August 4, 2006
Parking Garage by Wayne Densch Sports Center (now open for parking)

 

August 4, 2006
New Ticket office at UCF Arena (west side)

 

August 4, 2006
New Ticket office at UCF Arena (west side)

 

August 4, 2006
Psychology Building

 

August 4, 2006
Information Signs for Psychology Building

 

December 10, 2006
Bright House Stadium (and new parking lot by Wayne Densch)

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium (brick facade)

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

December 10, 2006
Bright House Stadium

 

November 21, 2006
Convocation Center (Courtesy of Centex Construction)

 

November 21, 2006
Convocation Center (Courtesy of Centex Construction)

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center (close up of exterior finish)

 

December 10, 2006
Convocation Center

December 10, 2006
Convocation Center

 

December 10, 2006
Convocation Center and Housing Towers 3 & 4

 

December 10, 2006
Psychology Building

 

December 10, 2006
Psychology Building

 

December 10, 2006
Retail "A"

 

December 10, 2006
Housing Tower 4

 

December 10, 2006
Housing Towers 3 & 4

 

December 19, 2006
Bright House Stadium (Courtesy of Wharton Smith)

 

December 19, 2006
Bright House Stadium (Courtesy of Wharton Smith)

 

December 20, 2006
Convocation Center (Courtesy of Centex Construction)

 

December 20, 2006
Convocation Center (Courtesy of Centex Construction)

 

Mid-January, 2007
Convocation Center (Courtesy of Centex Construction)
The new parking garage foundation is also partially visible

 

Mid-January, 2007
Bright House Stadium (Courtesy of Wharton Smith)

 

 

 

 

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

The following photos are from a hardhat stadium tour on February 17, 2007.  These photos were taken and generously provided by Bill Beekman - Hoops McKnight himself.  Thanks Bill!

Bill also provided the descriptions for each photo.

 

February 17, 2007
North End Zone

 

 

February 17, 2007
CK's (CitroKnight) Lad #1

 

 

February 17, 2007
Test plats for brick & stucco paint

 

 

February 17, 2007
SE corner, inside visitor’s locker room

 

 

February 17, 2007
Concourse from visitors’ locker room to field

 

 

February 17, 2007
Drainage culvert filled with gravel

 

 

February 17, 2007
Visitors’ first view of inside stadium

 

 

February 17, 2007
View of stands, press box from field

 

 

February 17, 2007
View of SW corner of stadium

 

 

February 17, 2007
Close up of stands

 

 

February 17, 2007
Pea gravel being covered by sand/peat mixture

 

 

February 17, 2007
Soil for playing surface (This is the stuff of Pulitzer Prizes, folks!)

 

 

February 17, 2007
View of north end zone from home team entrance to field

 

 

February 17, 2007
Close up of SW stands from home team entrance

 

 

February 17, 2007
Home team entrance

 

 

February 17, 2007
West side of home locker room

 

 

February 17, 2007
East side of home locker room

 

 

February 17, 2007
NE corner of Recruiting Center

 

 

February 17, 2007
Inside Recruiting Center

 

 

February 17, 2007
Outside SW corner of stadium

 

 

February 17, 2007
Service road, South side of stadium

 

 

February 17, 2007
Group heading to IPF

 

 

February 17, 2007
Brick façade, SW corner

 

 

February 17, 2007
Press box structure

 

 

February 17, 2007
Recruiting Center (right)

 

 

February 17, 2007
“Millionaire’s Game-Day Parking Lot”

 

 

February 17, 2007
North side of stadium from skybox level

 

 

February 17, 2007
Foreground – south side of stadium.  Background parking lot, practice field #3

 

 

February 17, 2007
Zoom out – what a view!!

 

 

February 17, 2007
Length of skybox suite section

 

 

February 17, 2007
Elevator shaft for east stands

 

 

February 17, 2007
Foreground again – south side of stadium.  Background parking lot, practice field #3

 

 



February 17, 2007
Zoom out again  – what a view!!

 

 

February 17, 2007
Broader picture of parking lot

 

 

February 17, 2007
Close up of parking lot’s north side

 

 

February 17, 2007
Soil being graded

 

 

February 17, 2007
Convo Center from skybox level

 

 

February 17, 2007
New/old parking garages behind Arena

 

 

Thanks Again Bill!!

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

 

 

 

May 4, 2007
Bright House Network