UCF New Construction Pics
Click on the thumbnails to expand pictures
October 24, 2004
This is going to be housing and is just west of the Arena.
October 24, 2004
This is going to be a
parking garage and is just west of the Arena.
November 16, 2004
Surface parking outside of Jay Bergman Field
November 16, 2004
Surface parking outside of Jay Bergman Field
November 16, 2004
Housing Tower 1 (west of Arena)
November 16, 2004
Fairwinds Alumni Center
November 16, 2004
Housing Tower 1 (west of Arena)
December 19, 2004
Surface parking outside of Jay Bergman Field
December 19, 2004
Surface parking outside of Jay Bergman Field
December 19, 2004
Surface parking outside of Jay Bergman Field
December 19, 2004
Parking garage (between Housing and Softball Field)
December 19, 2004
Housing Tower 1 (west of Arena)
December 19, 2004
Housing Tower 1 (west of Arena)
December 19, 2004
Housing Tower 1 (west of Arena)
December 19, 2004
Housing Tower 1 (west of Arena)
December 19, 2004
Housing Tower 1 (west of Arena)
December 19, 2004
Fairwinds Alumni Center
December 19, 2004
Recreational Pool
December 19, 2004
Recreational Pool
December 19, 2004
Recreational Pool
December 19, 2004
Retention Pond (south of existing pond that is east of new Wayne Densch Sports
Center)
December 19, 2004
Retention Pond (south of existing pond that is east of new Wayne Densch Sports
Center)
December 19, 2004
Building on fire behind Security Police building
December 19, 2004
Building on fire behind Security Police building
January 7, 2005
Recreational Pool
January 7, 2005
Recreational Pool
January 7, 2005
Recreational Pool
January 7, 2005
Housing Tower 1 (west of Arena)
January 7, 2005
Parking garage (between Housing and softball field)
January 7, 2005
View from Housing Tower 1 on 7th floor
January 7, 2005
View from Housing Tower 1 on 7th floor
January 7, 2005
Parking garage (view from Housing Tower 1 on 7th floor)
January 7, 2005
Housing Tower 1 (west of Arena)
January 7, 2005
Housing Tower 1 (west of Arena)
January 7, 2005
Fairwinds Alumni Center
January 7, 2005
Fairwinds Alumni Center
January 18, 2005
Fairwinds Alumni Center
January 18, 2005
Fairwinds Alumni Center
January 18, 2005
Housing Tower 1 (west of Arena)
January 18, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
January 23, 2005
Housing Tower 1 (west of Arena)
January 23, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
January 23, 2005|
Fairwinds Alumni Center
January 23, 2005|
Parking garage (between Housing Tower 1 and softball field)
January 23, 2005|
Imagine... just beyond the parking lot - our new
football
stadium!
January 31, 2005
Parking garage (between Housing and softball field)
These verticals went up in one day and the rest should go up fast as well.
These will NOT look like the other parking garages on campus. It will look
more like a building with windows more so than a parking garage. The whole
athletic node will have a Winter Park type of look to it when completed.
February 3, 2005
Parking garage (between Housing and softball field)
February 3, 2005
Housing Tower 1 (west of Arena)
February 8, 2005
Parking garage (between Housing Tower 1 and softball field)
February 13, 2005
Parking garage (between Housing Tower 1 and softball field)
February 13, 2005
Housing Tower 1 (west of Arena)
February 13, 2005|
Fairwinds Alumni Center
February 13, 2005
Housing Tower 1 and parking garage
February 13, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
February 13, 2005
Retention Pond (south of existing pond that is east of new Wayne Densch Sports
Center)
This must be completed before occupancy of the Nicholson
Field House is permitted.
Also - there was once some talk going around that this new pond could replace
the facility at Lake Pickett, but the truth is that for rowing competition there
must be a straight section of water of a minimum length (which I do not know).
What is known though is that this pond would have to go as far as Research Park
in order to be long enough for rowing competition.
February 13, 2005
Retention Pond (south of existing pond that is east of new Wayne Densch Sports
Center)
February 13, 2005
Retention Pond (south of existing pond that is east of new Wayne Densch Sports
Center)
February 13, 2005
Recreational Pool (with what appears to be the concrete foundations for the
canopy assembly)
February 13, 2005
Recreational Pool
February 19, 2005
Recreational Pool
February 19, 2005
Recreational Pool
February 20, 2005
Parking garage and housing Tower 1
(note how the garage will look more like the housing building than a parking
garage)
February 20, 2005
Parking garage
February 20, 2005
Fairwinds Alumni Center
March 1, 2005
Parking garage
March 1, 2005
Parking garage
March 12, 2005
Parking garage
March 12, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
March 12, 2005
Fairwinds Alumni Center
March 12, 2005
Housing Tower 1 (west of Arena) - Multi-colored exterior test
patterns being applied
March 22, 2005
Recreational Pool
March 22, 2005
Parking garage
March 22, 2005
Parking garage
March 22, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
March 22, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
March 22, 2005
Land cleared for 2nd and 3rd housing towers and parking garage
March 22, 2005
Housing Tower 1 (west of Arena) - white base coat being
applied
March 22, 2005
Housing Tower 1 (west of Arena) - white base coat and
multi-colored exterior test patterns being applied
March 22, 2005
Fairwinds Alumni Center
March 22, 2005
Fairwinds Alumni Center
March 29, 2005
Land clearing (east of Wayne Densch Sports Center) for new football practice fields
March 29, 2005
Land clearing (east of Wayne Densch Sports Center) for new football practice fields
March 29, 2005
Land clearing for new softball stadium
April 5, 2005
Recreational Pool
April 5, 2005
Recreational Pool
April 5, 2005
New Student Health Center (http://www.fp.ucf.edu/ActivityReport/new/newData/student_health_center.htm)
April 5, 2005
New Student Health Center (Close-up of sign)
April 5, 2005
New Student Health Center
April 5, 2005
Parking garage
April 5, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint
being applied
April 5, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint
being applied
April 5, 2005
Fairwinds Alumni Center
April 5, 2005
Fairwinds Alumni Center
April 5, 2005
Fairwinds Alumni Center
April 5, 2005
Land being cleared east of Wayne Densch Sports Center for new football practice
fields
April 14, 2005
Recreational Pool
April 19, 2005
Recreational Pool
April 19, 2005
Recreational Pool
April 21, 2005
Fairwinds Alumni Center
April 21, 2005
Engineering 3 Building (in the center)
May 8, 2005
Fairwinds Alumni Center
May 8, 2005
Fairwinds Alumni Center
May 8, 2005
Parking Garage (west of Arena)
May 8, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint being applied
May 8, 2005
Housing Tower 1 / Parking Garage (west of Arena) - multi earth tone paint being
applied
May 8, 2005
New Student Health Center (http://www.fp.ucf.edu/ActivityReport/new/newData/student_health_center.htm)
May 8, 2005
(back of) Engineering 3 Building
May 15, 2005
Housing Tower 1 (west of Arena) - multi earth tone paint being applied - now
taking rental applications
May 16, 2005
Recreational Pool (with water!!!)
May 16, 2005
Recreational Pool (with water!!!)
May 21, 2005
Parking Garage (west of Arena)
May 21, 2005
Housing Tower 1 (west of Arena)
May 21, 2005
Housing Tower 1 and parking garage (west of Arena)
May 21, 2005
Housing Tower 1 (west of Arena)
May 21, 2005
Right side: Housing Tower 1 (west of Arena)
Background: Fairwinds Alumni Center
May 21, 2005
Fairwinds Alumni Center
May 21, 2005
New retention pond (across road from Wayne Densch Sports Center)
May 21, 2005
Foreground: Northern tip of new retention pond (across road from Wayne
Densch Sports Center)
Background: Existing retention pond
Water is being pumped from the existing retention pond
into the new retention pond
May 21, 2005
Recreational pool (sod and landscaping in progress)
May 21, 2005
Recreational pool (sod and landscaping in progress)
May 21, 2005
Recreational pool (sod and landscaping in progress)
June 13, 2005
Arena retention pond being drained in preparation to build Convocation Center
wait a minute... is that guy flipping me off? :-)
June 13, 2005
Fairwinds Alumni Center
June 13, 2005
Recreational pool
June 20, 2005
New softball stadium (south side of new retention pond)
Covered batting cage is shown in the process of being reassembled after
moving it from the previous complex
June 22, 2005
Recreational pool
June 27, 2005
Arena retention pond being drained in preparation to build Convocation Center
June 27, 2005
Parking Garage (west of Arena)
June 27, 2005
Housing Tower 1 and parking garage (west of Arena)
July 6, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center
July 11, 2005
New softball stadium (south side of new retention pond)
July 18, 2005
Land being cleared for 2nd of 4 housing towers
July 18, 2005
Land being cleared for 2nd of 4 housing towers
July 18, 2005
New softball stadium (south side of new retention pond)
July 18, 2005
New softball stadium (south side of new retention pond)
July 18, 2005
Recreational pool - canopy being installed and raised.
July 18, 2005
Recreational pool (canopy being installed and raised)
July 20, 2005
Recreational pool (canopy being installed and raised)
July 25, 2005
Recreational pool
July 25, 2005
Land being cleared for 2nd of 4 housing towers
July 25, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center
July 25, 2005
Fairwinds Alumni Center
July 27, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center
July 27, 2005
Land being cleared for the 3rd and 4th housing towers as well as parking garage
July 27, 2005
Fairwinds Alumni Center
July 27, 2005
Recreational pool
August 6, 2005
New Softball Stadium
August 6, 2005
New Softball Stadium
August 6, 2005
Foundation for 2nd of 4 New Housing Towers
(pic taken from new parking garage roof)
August 6, 2005
Arena retention pond being filled with dirt in preparation to build Convocation Center
(pic taken from new parking garage roof)
September 11, 2005
New softball stadium
September 11, 2005
New softball stadium
September 11, 2005
New softball stadium (batting cage)
September 11, 2005
Fairwinds Alumni Center
September 11, 2005
Fairwinds Alumni Center
September 11, 2005
Housing Tower 2 (background)
September 11, 2005
Housing Tower 2
September 11, 2005
Materials coming in for parking garage and Housing Towers 3 & 4
September 11, 2005
F1 parking lot being removed
September 11, 2005
Construction preps for Convocation Center
September 11, 2005
Recreation Pool
September 11, 2005
Recreation Pool
October 9, 2005
Housing Tower 2
October 9, 2005
Housing Tower 2
October 9, 2005
Ground preps for Housing Towers 3 and 4 as well as parking garage
October 9, 2005
Fairwinds Alumni Center
October 9, 2005
Recreational Pool - Now Open
October 9, 2005
Recreational Pool - Now Open
October 9, 2005
New Student Health Center
October 9, 2005
New Student Health Center
October 9, 2005
New Softball Stadium - view from home plate
October 9, 2005
New Softball Stadium
October 9, 2005
New Softball Stadium - view from Center Field
October 30, 2005
Housing Tower 2
October 30, 2005
Ground preps for Housing Towers 3 and 4 as well as parking garage
Tower 3 (or 4?) can be seen in the background
October 30, 2005
Ground preps for Housing Towers 3 and 4 as well as parking garage
Tower 3 (or 4?) construction has begun
October 30, 2005
Construction preps for Convocation Center
October 30, 2005
Obviously not a new construction pic. This is my God daughter Beth who
wants to go to FSU. Hopefully this tour will change her mind!
November 12, 2005
Housing Tower 2
November 12, 2005
Housing Tower 3
November 12, 2005
Housing Tower 3
November 12, 2005
Construction preps for Convocation Center
November 12, 2005
Arena stairs coming down (Arena will be renovated)
November 12, 2005
Fairwinds Alumni Center
December 11, 2005
Housing Tower 2
December 11, 2005
Housing Tower 3
December 11, 2005
Housing Tower 3, Ground preps for parking garage and Housing Tower 4
December 11, 2005
Convocation Center initial construction
December 11, 2005
Convocation Center foundation underway
December 11, 2005
Convocation Center foundation underway
(Housing Tower 3 in background)
January 8, 2006
Retail "A" next to Housing Tower 1 and Convocation Center
January 8, 2006
Retail "A" next to Housing Tower 1 and Convocation Center
January 8, 2006
Convocation Center construction
January 8, 2006
Convocation Center construction
January 8, 2006
Convocation Center construction
January 8, 2006
Convocation Center construction (Housing Tower 3 in background)
January 8, 2006
Housing Tower 3
January 8, 2006
Housing Tower 3
January 8, 2006
Housing Tower 3
January 8, 2006
Housing Tower 3 (as seen from front of Wayne Densch Sports Center)
January 8, 2006
Underground utilities being added by Jay Bergman Field
January 8, 2006
New Soccer Fields being graded (in the
background)
January 8, 2006
Housing Tower 2
January 8, 2006
Parking garage V (University Blvd shown in background)
February 19, 2006
Housing Tower 2
February 19, 2006
Housing Tower 3
February 19, 2006
Housing Tower 3
February 19, 2006
Housing Tower 3
February 19, 2006
Convocation Center (Retail
"A" shown in background)
February 19, 2006
Convocation Center
February 19, 2006
Convocation Center
February 19, 2006
Convocation Center
February 19, 2006
Convocation Center
February 19, 2006
Retail "A" <<<Click this link
February 19, 2006
Psychology Building <<<Click this link
February 19, 2006
Softball Stadium
February 19, 2006
Softball Stadium
February 19, 2006
Softball Stadium
February 19, 2006
Softball Stadium
February 19, 2006
Softball Stadium
February 19, 2006
Softball Stadium
February 19, 2006
Softball Stadium
March 19, 2006
Housing Tower 3 (Background) and Housing Tower 4 (foreground)
March 19, 2006
Housing Tower 3 and Housing Tower 4 (Twr 4 is to the left)
March 19, 2006
Housing Tower 4
March 19, 2006
Housing Tower 2
March 19, 2006
Convocation Center (Retail
"A" shown along street at right)
March 19, 2006
Convocation Center
March 19, 2006
Convocation Center (Housing Towers 3 and 4 in the background)
March 19, 2006
Convocation Center (Housing Towers 3 and 4 in the background)
March 19, 2006
Convocation Center (Housing Towers 3 and 4 in the background)
March 19, 2006
Convocation Center
March 19, 2006
Retail
"A" <<<Click this link
March 19, 2006
Psychology Building <<<Click this link
March 19, 2006
Parking garage V <<<Click this link
(University Blvd shown in background)
March 19, 2006
Softball stadium Press Box
Video Video Video Video Video Video Video Video
Video Video Video Video Video Video Video Video
Click the photo above and allow time for the video to download and automatically play. It may be jittery on your first viewing, but should smooth out after that.
The video consists of the Psychology Bldg,, Convo Center, Housing 3 & 4, Football practice fields, CREOL extension, Engineering 3, and Parking Garage V.
April 23, 2006
Convocation Center
April 23, 2006
Retail
"A" <<<Click this link
April 23, 2006
Housing Towers 3 and 4
April 23, 2006
Convocation Center
April 23, 2006
Psychology Building <<<Click this link
April 23, 2006
Football practice fields
April 23, 2006
Parking Garage & Housing Towers 3 and 4 (as seen from Wayne Densch)
April 23, 2006
Parking Garage (as seen from Wayne Densch)
April 23, 2006
CREOL Extension
April 23, 2006
Engineering 3 <<<Click this link
April 23, 2006
Parking garage V (University Blvd shown in background)
May 20, 2006
Land preparations for football stadium
May 20, 2006
Land preparations for football stadium
May 20, 2006
New football practice fields
May 20, 2006
New football practice fields
May 20, 2006
Land preparations for football stadium
May 20, 2006
Land preparations for football stadium
May 20, 2006
Land preparations for football stadium
May 20, 2006
Convocation Center
May 20, 2006
Convocation Center
May 20, 2006
Convocation Center
May 20, 2006
Convocation Center
May 20, 2006
Convocation Center, Housing Towers 3 and 4, Parking
Garage
May 20, 2006
Psychology Building
May 20, 2006
Convocation Center
June 8, 2006
Convocation Center
June 8, 2006
Convocation Center
June 8, 2006
Convocation Center
June 8, 2006
Retail
"A" <<<Click this link
June 8, 2006
Housing Tower 4
June 8, 2006
Housing Towers 3 and 4
June 8, 2006
Ground Preps for Football Stadium
June 8, 2006
Ground Preps for Football Stadium
June 8, 2006
New Football Practice Fields
June 8, 2006
New Football Practice Fields and Ground Preps for Football Stadium
June 8, 2006
New Football Practice Fields and Ground Preps for Football Stadium
June 8, 2006
New Football Practice Fields
June 8, 2006
New Football Practice Fields
June 8, 2006
Housing Towers 3 & 4 and Parking Garage
July 2, 2006
Ground Preps for Football Stadium
July 2, 2006
Ground Preps for Football Stadium
July 2, 2006
Ground Preps for Football Stadium
July 2, 2006
Ground Preps for Football Stadium
July 2, 2006
Practice Fields and
Ground Preps for Football Stadium
July 2, 2006
Convocation Center
July 2, 2006
Convocation Center
July 2, 2006
Convocation Center
July 2, 2006
Convocation Center
July 2, 2006
Convocation Center
July 2, 2006
Convocation Center
July 2, 2006
Retail "A"
July 2, 2006
Parking Garage and Housing Tower 3
July 2, 2006
Housing Towers 3 and 4
July 2, 2006
Housing Tower 4
July 2, 2006
Housing Tower 3
July 2, 2006
Not new construction, but it looked like a Kodak moment anyway
August 4, 2006
Football Stadium
August 4, 2006
Football Stadium
August 4, 2006
Football Stadium
August 4, 2006
Football Stadium
August 4, 2006
Football Stadium
August 4, 2006
Football Stadium
August 4, 2006
Football Stadium (as seen from tower in practice fields)
August 4, 2006
Football Stadium (as seen from tower in practice fields)
August 4, 2006
Football Stadium (as seen from tower in practice fields)
August 4, 2006
Football Stadium (as seen from tower in practice fields)
August 4, 2006
New Practice Fields
August 4, 2006
New Practice Fields
August 4, 2006
New Practice Fields
August 4, 2006
New Practice Fields
August 4, 2006
New Practice Fields
August 4, 2006
New Practice Fields
August 4, 2006
Matt Davis and Paul Bender getting video equipment ready for tomorrow's practice
Matt (left) recently joined UCF having come from Marshall. Let's try to
like him anyway!
August 4, 2006
Convocation Center
August 4, 2006
Housing Tower 3 (left) and Convocation Center (right)
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center (seating area starting to take shape)
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Convocation Center
August 4, 2006
Parking Garage (left) and Housing Tower 3 (right)
August 4, 2006
Housing Tower 3 (left) and Convocation Center (right)
August 4, 2006
Housing Tower 2
August 4, 2006
Housing Tower 4
August 4, 2006
Housing Tower 3
August 4, 2006
Housing Tower 4
August 4, 2006
Parking Garage by Wayne Densch Sports Center (now open for parking)
August 4, 2006
New Ticket office at UCF Arena (west side)
August 4, 2006
New Ticket office at UCF Arena (west side)
August 4, 2006
Psychology Building
August 4, 2006
Information Signs for Psychology Building
December 10, 2006
Bright House Stadium (and new parking lot by Wayne Densch)
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium (brick facade)
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
December 10, 2006
Bright House Stadium
November 21, 2006
Convocation Center (Courtesy of Centex Construction)
November 21, 2006
Convocation Center (Courtesy of Centex Construction)
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center (close up of exterior finish)
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center
December 10, 2006
Convocation Center and Housing Towers 3 & 4
December 10, 2006
Psychology Building
December 10, 2006
Psychology Building
December 10, 2006
Retail "A"
December 10, 2006
Housing Tower 4
December 10, 2006
Housing Towers 3 & 4
December
19, 2006
Bright House Stadium (Courtesy of Wharton Smith)
December
19, 2006
Bright House Stadium (Courtesy of Wharton Smith)
December 20, 2006
Convocation Center (Courtesy of Centex Construction)
December 20, 2006
Convocation Center (Courtesy of Centex Construction)
Mid-January, 2007
Convocation Center (Courtesy of Centex Construction)
The new parking garage foundation is also partially visible
Mid-January, 2007
Bright House Stadium (Courtesy of Wharton Smith)
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
The following photos are from a hardhat stadium tour on February 17, 2007. These photos were taken and generously provided by Bill Beekman - Hoops McKnight himself. Thanks Bill!
Bill also provided the descriptions for each photo.
February 17, 2007
North End Zone
February 17, 2007
CK's (CitroKnight) Lad #1
February 17, 2007
Test plats for brick & stucco paint
February 17, 2007
SE corner, inside
visitor’s locker room
February 17, 2007
Concourse from
visitors’ locker room to field
February 17, 2007
Drainage culvert filled with gravel
February 17, 2007
Visitors’ first view
of inside stadium
February 17, 2007
View of stands, press box from field
February 17, 2007
View of SW corner of
stadium
February 17, 2007
Close up of stands
February 17, 2007
Pea gravel being
covered by sand/peat mixture
February 17, 2007
Soil for playing
surface (This is the stuff of Pulitzer Prizes, folks!)
February 17, 2007
View of north end
zone from home team entrance to field
February 17, 2007
Close up of SW stands
from home team entrance
February 17, 2007
Home team entrance
February 17, 2007
West side of home
locker room
February 17, 2007
East side of home
locker room
February 17, 2007
NE corner of
Recruiting Center
February 17, 2007
Inside Recruiting
Center
February 17, 2007
Outside SW corner of
stadium
February 17, 2007
Service road, South
side of stadium
February 17, 2007
Group heading to IPF
February 17, 2007
Brick façade, SW
corner
February 17, 2007
Press box structure
February 17, 2007
Recruiting Center
(right)
February 17, 2007
“Millionaire’s
Game-Day Parking Lot”
February 17, 2007
North side of stadium
from skybox level
February 17, 2007
Foreground – south
side of stadium. Background parking lot, practice field #3
February 17, 2007
Zoom out – what a
view!!
February 17, 2007
Length of skybox
suite section
February 17, 2007
Elevator shaft for
east stands
February 17, 2007
Foreground again –
south side of stadium. Background parking lot, practice field #3
February 17, 2007
Zoom out again
– what a view!!
February 17, 2007
Broader picture of
parking lot
February 17, 2007
Close up of parking
lot’s north side
February 17, 2007
Soil being graded
February 17, 2007
Convo Center from
skybox level
February 17, 2007
New/old parking
garages behind Arena
Thanks Again Bill!!
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
Bright House Networks Stadium
May 4, 2007
New Road north of Bright House Networks
Stadium
May 4, 2007
Psychology Building (Pedestrian Mall in
foreground)
May 4, 2007
Psychology Building (Pedestrian Mall in
foreground)
May 4, 2007
Psychology Building (Pedestrian Mall in
foreground)
May 4, 2007
Convocation Center (Pedestrian Mall in
foreground)
May 4, 2007
Convocation Center (Pedestrian Mall in
foreground)
May 4, 2007
Convocation Center
May 4, 2007
Convocation Center
May 4, 2007
Convocation Center
May 4, 2007
Convocation Center
May 4, 2007
Retail "A"
May 4, 2007
Retail "B"
May 4, 2007
Retail "B"
May 4, 2007
Retail "C" and Housing Tower 3
May 4, 2007
Retail "C" and Housing Tower 3
May 4, 2007
Convocation Center Parking Garage
May 4, 2007
Convocation Center Parking Garage
May 4, 2007
Convocation Center Parking Garage
May 4, 2007
Convocation Center Parking Garage
May 4, 2007
Convocation Center Parking Garage
May 4, 2007
Convocation Center Parking Garage
May 4, 2007
Convocation Center Parking Garage
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
June 23, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Bright House Networks Stadium
Full Size
Half Size
July 27, 2007
Football Practice Fields and Tower
Full Size
Half Size
July 27, 2007
Convocation Center (New Arena)
Full Size
Half Size
July 27, 2007
Convocation Center (New Arena)
Full Size
Half Size
July 27, 2007
Convocation Center (New Arena)
Full Size
Half Size
July 27, 2007
Convocation Center (New Arena)
Full Size
Half Size
July 27, 2007
Convocation Center (New Arena)
Full Size
Half Size
July 27, 2007
Pedestrian Mall and Lot 13
Full Size
Half Size
July 27, 2007
Pedestrian Mall and Lot 13
Full Size
Half Size
July 27, 2007
Lot 13 (Adjacent to Pedestrian Mall)
Full Size
Half Size
July 27, 2007
Not new, but I couldn't pass this up!
Full Size
Half Size
July 27, 2007
Helicopter Pilot / UCF Policeman Earl Cowan
Full Size
Half Size
July 27, 2007
Helicopter Pilot / UCF Policeman Earl Cowan
Full Size
Half Size
July 27, 2007
Passenger and picture taker 1KnightStan
To see video of this tour click HERE
UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF
With the re-branding and logo changes it was time to call on Mr. John Frantz again to use his services to sandblast the new logos in the Wayne Densch Sports Center doors. This time we (BCNHS, Knightshift, 1KnightStan, and Chris Ristau) included the doors on the north side of Wayne Densch. Also included was the single pane of glass between the two sets of double doors at the entry to the lobby for the Roth Tower at Bright House Networks Stadium. As some of you may recall John also etched the previous logo into the Wayne Densch doors back in January, 2005 (See Indoor Practice Facility photos - January 11, 2005). John's website can be found here:
http://www.carvedglasscompany.com/
Here are the photos (taken on September 25, 2007):
UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF_UCF
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
Old Arena Renovation
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
(This arch will span across the top)
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
(These are the side boxes for sponsors)
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
Full Size
Half Size
March 21, 2008
New Baseball Video/Score Board
September 19, 2008
Logo etching (Athletic Director's door)
September 19, 2008
Logo etching (President's Suite at BHNS)
September 19, 2008
Logo etching (President's Suite at BHNS)
September 19, 2008
Logo etching (President's Suite at BHNS)
September 19, 2008
Logo etching (Old UCF Arena)
September 19, 2008
Logo etching (Old UCF Arena)
September 19, 2008
Logo etching (Old UCF Arena)
September 19, 2008
Logo etching (Old UCF Arena)
July 10, 2009
Arts Complex II
July 10, 2009
Arts Complex II
July 10, 2009
Recreation Center
Expansion (Demolition of Bldg 15 and Lap Pool)
July 10, 2009
Recreation Center
Expansion (Demolition of Bldg 15 and Lap Pool)
July 10, 2009
Recreation Center
Expansion (Demolition of Bldg 15 and Lap Pool)
August 1, 2009
Arts Complex II
August 1, 2009
Arts Complex II
August 1, 2009
Arts Complex II
August 1, 2009
Thermal Energy Storage Tank
August 1, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
August 1, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
August 15, 2009
Thermal Energy Storage Tank
August 15, 2009
Thermal Energy Storage Tank
August 15, 2009
Arts Complex II

August 15, 2009
Arts Complex II
August 15, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
August 29, 2009
Thermal Energy Storage Tank
August 29, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
August 29, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
August 29, 2009
Arts Complex II
August 29, 2009
Arts Complex II
September 4, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
September 4, 2009
Arts Complex II
September 4, 2009
Arts Complex II
September 4, 2009
Arts Complex II
September 4, 2009
Thermal Energy Storage Tank
September 4, 2009
Thermal Energy Storage Tank
October 10, 2009
Arts Complex II
October 10, 2009
Arts Complex II
October 10, 2009
Arts Complex II
October 10, 2009
Arts Complex II
October 10, 2009
Arts Complex II
October 10, 2009
Thermal Energy Storage Tank
October 10, 2009
Thermal Energy Storage Tank
October 10, 2009
Physical Sciences Building II
October 10, 2009
Physical Sciences Building II
October 10, 2009
Physical Sciences Building II
October 10, 2009
Physical Sciences Building II
October 10, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
October 31, 2009
Physical Sciences Building II
October 31, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
October 31, 2009
Arts Complex II
October 31, 2009
Arts Complex II
October 31, 2009
Arts Complex II
October 31, 2009
Arts Complex II
December 6, 2009
Physical Sciences Building II
December 6, 2009
Recreation Center
Expansion (Bldg 15 and Lap Pool are gone)
October 31, 2009
Arts Complex II
October 31, 2009
Arts Complex II
October 31, 2009
Arts Complex II
October 31, 2009
Arts Complex II
February 7, 2010
Recreation Center
Expansion
February 7, 2010
Recreation Center
Expansion
February 7, 2010
Physical Sciences Building II
February 7, 2010
Physical Sciences Building II
February 7, 2010
Arts Complex II
February 7, 2010
Arts Complex II
February 7, 2010
Arts Complex II
February 7, 2010
Arts Complex II
February 7, 2010
Arts Complex II
February 7, 2010
New sign along Alafaya Trail
February 7, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
February 7, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
February 7, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
April 18, 2010
Physical Sciences Building II
April 18, 2010
Physical Sciences Building II
April 18, 2010
Recreation Center
Expansion
April 18, 2010
Recreation Center
Expansion
April 18, 2010
Recreation Center
Expansion
April 18, 2010
Arts Complex II
April 18, 2010
Arts Complex II
April 18, 2010
Arts Complex II
April 18, 2010
Arts Complex II
April 18, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
April 18, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
April 18, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
April 18, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
June 13, 2010
Recreation Center
Expansion
June 13, 2010
Recreation Center
Expansion

June 13, 2010
Recreation Center
Expansion
June 13, 2010
Recreation Center
Expansion
June 13, 2010
Recreation Center
Expansion
June 13, 2010
Physical Sciences Building II
June 13, 2010
Physical Sciences Building II
June 13, 2010
Morgridge International Reading Center
June 13, 2010
Morgridge International Reading Center
June 13, 2010
Arts Complex II
June 13, 2010
Arts Complex II
June 13, 2010
Arts Complex II
June 13, 2010
Arts Complex II
June 13, 2010
Land cleared for
Parking Garage VI
June 13, 2010
Land cleared for
Parking Garage VI
June 13, 2010
Land cleared for
Parking Garage VI
June 13, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
June 13, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
June 13, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
July 25, 2010
Physical Sciences Building II
July 25, 2010
Recreation Center
Expansion
July 25, 2010
Recreation Center
Expansion
July 25, 2010
Morgridge International Reading Center (land cleared)
July 25, 2010
Arts Complex II
July 25, 2010
Arts Complex II
July 25, 2010
Arts Complex II
July 25, 2010
Arts Complex II
July 25, 2010
Parking lot? Not sure about this one yet.
It is just north of Greek Row
July 25, 2010
Land cleared for
Parking Garage VI
July 25, 2010
Land cleared for
Parking Garage VI
July 25, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
July 25, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
July 25, 2010
Career Services and Experiential Learning Center (between Psychology and
Fairwinds Alumni Center)
February 19, 2011
Physical Sciences Building II
February 19, 2011
Recreation Center
Expansion
February 19, 2011
Recreation Center
Expansion
February 19, 2011
Recreation Center
Expansion
February 19, 2011
Morgridge International Reading Center
February 19, 2011
Morgridge International Reading Center
February 19, 2011
Arts Complex II
February 19, 2011
Arts Complex II
February 19, 2011
Arts Complex II
February 19, 2011
Arts Complex II
February 19, 2011
Parking Garage VI
February 19, 2011
Parking Garage VI
February 19, 2011
Track and Soccer Stadium
February 19, 2011
Track and Soccer Stadium
Interested in UCF Athletics? Try these links out: